Features:
Manual blowing
Double nail design
Oil removal film
water level casing port
It is recommended
to float up and down
about 3cm from the
horizontal plane.
1.Correct height of
the installation set of had
2.Tube must be vertical
Under normal
conditions, it is
generally recommended
that 2/3 of the air be
removed from the
groove, leaving 1/3 of
the air behind.
Small flow (not rotating)
1. The groove is full of air, so it floats and does not enter
the water and does not rotate, you need to use a syringe to pump
out some of the air, so that the floating basket reduces buoyancy
and sinks.
2, close the small inlet flow, increase suction
3. Adjust the flow rate upward through the frequency conversion
water pump, increase the suction.
High flow (sinking)
1. Add hand valve control under the casing to reduce the water
flow.
2. Increase the diameter of the water inlet pipe, or increase a
water inlet
3. Adjust the flow rate downward by frequency conversion pump
to reduce the suction.
Adjust Flow easily